FAQ - Frequently Asked Questions
- Products Search > Elemental Analysis
Keyword Search
Frequently Referenced FAQ
FAQ within [ Elemental Analysis ]
-
Approximately 10L of pure water is used as the coil cooling water. Replace the water withnew one when fur forms in it. WARNIGN:You may get an electric... Show Detail
- No:6771
- Date of Issue:2021/08/18 15:08
- Category: Sequential type(ICPS)
-
Check the tank periodically to make sure the following. ・ The waste liquid is not overflow. ・ The drain tube does not come in contact with the liquid surfa... Show Detail
- No:6772
- Date of Issue:2021/08/18 15:08
- Last Updated:2021/09/13 09:15
- Category: Sequential type(ICPS)
-
(ICPS) Cleaning of Condensing Lens
If the condensing lens is used for a long time, its surface is contaminated, deteriorating transmittance. 1) Remove the stand top cover. 2) Pull... Show Detail
- No:6774
- Date of Issue:2021/08/18 15:30
- Category: Sequential type(ICPS)
- Brached FAQ
-
(ICPS) Replacement of RF Power Fuse
When the RF power generator fuse (F1 & F2) is blown, replace it following the procedures below. WARNING:You may get an electric shock.. Before starting op... Show Detail
- No:6777
- Date of Issue:2021/08/18 15:57
- Category: Sequential type(ICPS)
- Brached FAQ
-
(ICPS) Starting Up of Equipment
1.Supply of power to equipment 1) Turn ON the main breaker B1 (lift the lever). The pilot lamp S2is lit. 2) Turn ON (Press) the pump start switc... Show Detail
- No:6778
- Date of Issue:2021/08/18 16:10
- Category: Sequential type(ICPS)
- Brached FAQ
-
1.Turning off of plasma 1) Inspire pure water for three to five minutes. This allows the sample suction tube, nebulizer, chamber and torch to be cle... Show Detail
- No:6780
- Date of Issue:2021/08/18 16:14
- Category: Sequential type(ICPS)
- Brached FAQ
-
1. Action in Emergency 1) If you do not have an enough time to stop the equipment following ordinary procedures,for example, in case of fire and earthq... Show Detail
- No:6781
- Date of Issue:2021/08/18 16:25
- Category: Sequential type(ICPS)
- Brached FAQ
-
(ICPS) Spectrum intensity much lowers.
・ Deposit adheres the tip of the nebulizer. ・ Deterioration of the nebulizer ・ Deterioration of the sample suction tube ・ Bubble is found into the sample ... Show Detail
- No:6782
- Date of Issue:2021/08/19 09:36
- Category: Sequential type(ICPS)
-
(ICPS) Low stability of spectrum intensity
• The ICPSinstallation location does not meet requirements related to installation location or facilities. • One of the causes listed for problem "Spectrum ... Show Detail
- No:6784
- Date of Issue:2021/08/19 09:39
- Last Updated:2022/01/18 09:51
- Category: Sequential type(ICPS)
-
(ICPS) Condensation is found on the RF coil
• Wipe off the water droplets with gauze or some otherappropriate material and ignite the plasma. • Checks that the installation location meets the installa... Show Detail
- No:6783
- Date of Issue:2021/08/19 09:40
- Last Updated:2022/01/17 15:38
- Category: Sequential type(ICPS)
121-130 of Total 132