Products Search
>
GC-MS
>
Maintenance
>
GC/GC-MS Maintenance Help ( Part1 )
Back
No : 9725
Date of Issue : 2024/01/17 09:59
Last Updated : 2026/05/19 15:34
Print
GC/GC-MS Maintenance Help ( Part1 )
This document describes the maintenance procedures for GC/GC-MS/Peripheral Devices. Some information on the parts used for maintenance is also included.
Table of Contents:1
GC:
GC-2060
Table of Contents:2
GC:
GC-2050
,
GC-2030
,
GC-2010
,
GC-2014
,
GC-2025
GC-MS:
GCMS-QP2050
Peripheral Devices:
AOC-30/20 series
,
HS-20 series
Category :
Products Search
>
GC
>
Maintenance
Products Search
>
GC-MS
>
Maintenance
Answer
GC-2060
Injection Port
SPL(Split/Splitless Sample Injection Unit)
Replacement of Septum
Replacement of O-ring and Glass Insert
Replacement of Split Filter
WBI(Direct Sample Injection Unit)
Replacement of Septum
Replacement of O-ring and Glass Insert
OCI-NX(On-Column Sample Injection Unit)
Replacement of Septum and Liner
Column Installation (When Using OCI)
MMI(Multi-Mode Sample Injection Unit)
Replacement of Septum
Replacement of O-ring and Liner
Replacement of Split Filter
Replacement of TD Tube
Replacement of Adapter
SINJ(Single Packed Sample Injection Unit)
Replacement of Septum
Installation of Packed Column
Installation of SUS Column
Installation of Glass Column
SPI
Replacement of Split Filter
Reference Information
Guide for Packing Position of Silica Wool
Procedures for Inactivation of Glass Insert (DMCS)
Column Oven
Installation of Capillary Column
Installation of Capillary Column (Graphite Ferrule)
Installation of Capillary Column (When Using MMI Direct Analysis)
Installation of Capillary Column(Graphite Vespel Ferrule)
Installation of Adapter for Wide Bore Capillary Column (Adapter for WBC) and Column
Installation of Capillary Column(ClickTek)
Installation of Capillary Column (ClickTek Ferrule)
Installation of ClickTek Adapter
Assembly of Pre-fix Tool
Installation of Packed Column
Installation of SUS Column
Installation of Glass Column
Reference Information
Column Conditioning
Ferrule Type
Controllable ranges of temperature program rates
GC Detector
FID
Replacement of FID Igniter
Inspection and Replacement of FID Collector
Inspection and Replacement of FID Jet
Replacement of Jetanizer
FTD
Replacement of FTD Collector
Replacement of FTD Jet
Conditioning of FTD Alkaline Source
Reproduction of FTD Alkaline Source
FPD
Replacement of FPD Interference Filter
Inspection of FPD Igniter Filament
Replacement of FPD Quartz Tube
STCD
You cannot perform maintenance by yourself.
Contact your Shimadzu representative for maintenance and inspection.
ECD
BID
Trouble Shooting
Error Message
Hydrogen Sensor
Hydrogen sensor (Ver.2)
Filter replacement of hydrogen sensor