• Font Size
  • S
  • M
  • L
  • No : 7705
  • Date of Issue : 2022/01/20 14:21
  • Last Updated : 2022/01/20 14:35
  • Print

(EZ-Test) Inspection of Test Force

(EZ-Test) Inspection of Test Force
Category : 

Answer

Check wheter the test force is approximately correct or not.
1. Prepare the test force calibration jig.
2. Insert the joint for UJ into the bo ttom hole of the tensile joint, and and fix with the pin.
3. Set the test force polarity to Tensile.
4. Performe the electronically calibration (E-CAL).
  Click here for "(EZ-Test) Calibrating Test Force (E-CAL)".
5. Check that the displayed test force value increases by pushing the weight with your hand.
6. Set the weight in the calibration jig.
7. Confirm that the test force value is within the allowable error range below.
  Allowable Error Range:
    within 1% of indicated value for standard accuracy
    within 0.5% of indicated value for high accuracy

May I have your opinion?

Please provide your feedback below. This is for feedback only. You will not receive a response.
This site uses the FAQ system "PKSHA FAQ", which is a product of PKSHA Communication Inc.