FAQ - Frequently Asked Questions
- Products Search > GC-MS > Maintenance > GC/GC-MS Maintenance Help
GC/GC-MS Maintenance Help
This document describes the maintenance procedures for GC/GC-MS/Peripheral Devices. Some information on the parts used for maintenance is also included.
- Category :
Answer
Peripheral Devices: AOC-30/20 series, HS-20 series
Injection Port | Replacement of Septum | Replacement of Septum |
Replacement of Glass Insert | SPL/WBI Replacement of O-ring and Glass Insert | |
Other | SPL/PTV Replacement of Split Filter | |
Reference Information | Guide for Packing Position of Silica Wool | |
Procedures for Inactivation of Glass Insert (DMCS) | ||
Column Oven | Installation of Capillary Column | Installation of Capillary Column (Graphite Ferrule) |
Installation of Capillary Column(ClickTek) | Installation of Capillary Column (ClickTek Ferrule) | |
Installation of ClickTek Adapter | ||
Assembly of Pre-fix Tool | ||
Reference Information | Column Conditioning | |
Ferrule Type | ||
Controllable ranges of temperature program rates | ||
GC Detector | FID | Replacement of FID Igniter |
Inspection of FID Collector and Replacement of Jet | ||
FPD | Replacement of FPD Interference Filter | |
Inspection of FPD Igniter Filament | ||
Replacement of FPD Quartz Tube | ||
Trouble Shooting | Error Message | |
Hydrogen Sensor | Hydrogen sensor (Ver.2) | Filter replacement of hydrogen sensor |
Injection Port | SPL (Split/Splitless Sample Injection Unit) | Replacement of Septum |
Replacement of O-ring and Glass Insert | ||
Replacement of Split Filter | ||
Reference Information | Guide for Packing Position of Silica Wool | |
Procedures for Inactivation of Glass Insert (DMCS) | ||
Column Oven | Installation of Capillary Column | Installation of Capillary Column (Vespel Ferrule) |
Installation of Guard Column | ||
Reference Information | Ferrule Type | |
MS Detector | Replacement of EI Ion Source | |
Replacement of Filaments | ||
Change of Rotary Pump Oil (ULVAC GHD-031) |
AOC-30/20 series | Replacement of Syringe | ||
Maintenance of Syringe | |||
HS-20 series | Crimp vial | Crimping a Vial Cap | |
Removal of crimped cap | Removal of Aluminum Cap | ||
Removal of Heat-Resistant Cap (Iron) | |||
Attaching a Barcode Label | |||
Needle, Sample loop, Valve rotor, Trap tube | Installation and Removal of Maintenance Cover | ||
Needle Replacement Procedure | |||
Sample Loop Replacement Procedure | |||
Valve Rotor Replacement Procedure | |||
Trap Tube Replacement Procedure (HS-20 Trap) | |||
Column oven, Transfer line | Column Replacement Procedure (HS-20, HS-20 Trap) | ||
Column Replacement Procedure (HS-20 L.T) |
May I have your opinion?
This site uses the FAQ system "PKSHA FAQ", which is a product of PKSHA Communication Inc.