• Font Size
  • S
  • M
  • L
  • No : 8395
  • Date of Issue : 2022/02/24 10:41
  • Print

(PPSQ) In an Emergency / Actions in the Event of a Power Failure

(PPSQ) In an Emergency / Actions in the Event of a Power Failure
Category : 

Answer

« In an Emergency /  »
If any problem is detected, such as a burning smell, take the following action.
1. Turn OFF the power of the PPSQ main unit.
2. Turn OFF the power to all of the provided instruments (solvent delivery module, UV-VIS detector, column oven).
3. Disconnect the power cable at the rear of the instrument.
When the instrument is used again, inspect the instrument and, if necessary, contact a Shimadzu sales or service representative.
 
« Actions in the Event of a Power Failure »
Take the following measures in the event of a power outage.
1. Turn OFF the power of the PPSQ main unit.
2. Turn OFF the power to all of the provided instruments (solvent delivery module, UV-VIS detector, column oven).
3. Disconnect the power cable at the rear of all units.

May I have your opinion?

Please provide your feedback below. This is for feedback only. You will not receive a response.
This site uses the FAQ system "PKSHA FAQ", which is a product of PKSHA Communication Inc.