FAQ - Frequently Asked Questions
- Products Search > Materials Testing & Inspection > Autograph(AG) > AGX-V Series > (AGX-V) Calibration of a Load Cell (E-CAL)
(AGX-V) Calibration of a Load Cell (E-CAL)
(AGX-V) Calibration of a Load Cell (E-CAL)
- Category :
Answer
From the LCD touch panel of the smart controller, execute E-CAL (electronic calibration).
« When starting up »
1. Follow the message displayed after warming up ends and press [Execute E-CAL] to execute E-CAL.
1. Follow the message displayed after warming up ends and press [Execute E-CAL] to execute E-CAL.
« After starting up »
1. Press [Set].
2. Press [Execute E-CAL].
3. Press [OK] to execute E-CAL.
NOTE:
• To perform E-CAL of test force, apply no load and wait at least 15 minutes after powering the load cell.
• E-CAL takes approximately 30 seconds to be completed.
• Perform no operation until E-CAL is completed.
• Tests cannot be performed after the load cell is replaced/attached unless E-CAL is executed.
• E-CAL takes approximately 30 seconds to be completed.
• Perform no operation until E-CAL is completed.
• Tests cannot be performed after the load cell is replaced/attached unless E-CAL is executed.
May I have your opinion?
This site uses the FAQ system "PKSHA FAQ", which is a product of PKSHA Communication Inc.