• Font Size
  • S
  • M
  • L
  • No : 8046
  • Date of Issue : 2022/01/31 14:28
  • Print

(AGX-V) Calibration of a Load Cell (E-CAL)

(AGX-V) Calibration of a Load Cell (E-CAL)
Category : 

Answer

From the LCD touch panel of the smart controller, execute E-CAL (electronic calibration).
 
« When starting up »
1. Follow the message displayed after warming up ends and press [Execute E-CAL] to execute E-CAL.
  
 
« After starting up »
1. Press [Set].
  
2. Press [Execute E-CAL].
  
3. Press [OK] to execute E-CAL.
  
 
NOTE:
• To perform E-CAL of test force, apply no load and wait at least 15 minutes after powering the load cell.
• E-CAL takes approximately 30 seconds to be completed.
• Perform no operation until E-CAL is completed.
• Tests cannot be performed after the load cell is replaced/attached unless E-CAL is executed.

May I have your opinion?

Please provide your feedback below. This is for feedback only. You will not receive a response.
This site uses the FAQ system "PKSHA FAQ", which is a product of PKSHA Communication Inc.