• Font Size
  • S
  • M
  • L

Frequently Referenced FAQ

FAQ within [ Maintenance ]

21-23 of Total 23

3 / 3page
  • Maintenance of the APCI Unit (LCMS)

    Parts Number: 225-15845-91 APCI pipe ASSY 1. Remove the APCI unit from the instrument. 2. Remove the APCI cover. a)Remove the two screws whi... Show Detail

    • No:3241
    • Date of Issue:2020/11/16 12:56
    • Brached FAQ
  • Maintenance of the ESI Unit (LCMS)

    A high voltage (up to 5kV) is applied to the sample solution sprayed from the tip of the capillary ASSY in order to ionize the sample. Since a very fine-gaug... Show Detail

    • No:3239
    • Date of Issue:2020/11/13 11:11
    • Brached FAQ
  • Daily Maintenance (LCMS)

    To suppress contamination or blockage of the ionization unit or interface as much as possible, a daily management of the instrument is required. The followin... Show Detail

    • No:3246
    • Date of Issue:2020/11/13 10:12
    • Last Updated:2022/06/24 12:56

21-23 of Total 23

This site uses the FAQ system "PKSHA FAQ", which is a product of PKSHA Communication Inc.