• Font Size
  • S
  • M
  • L

Frequently Referenced FAQ

FAQ within [ Protein Sequencer(PPSQ) ]

1-10 of Total 18

1 / 2page
  • (PPSQ) In an Emergency / Actions in the Event of a Power ...

    «In an Emergency / » If any problem is detected, such as a burning smell, take the following action. 1. Turn OFF the power of the PPSQmain unit. 2. Turn... Show Detail

    • No:8395
    • Date of Issue:2022/02/24 10:41
  • (PPSQ) Replacing Reagents

    The procedure for replacing reagents is described below. After replacement, it isrecommended that the reagent and solvent bottles are purged in order to prev... Show Detail

    • No:8398
    • Date of Issue:2022/02/24 12:52
  • (PPSQ) Removing Reagents

    To replace a reagent without mixing the new reagent with the previous one, or whenshutting down the system, remove the reagent using the procedure described ... Show Detail

    • No:8400
    • Date of Issue:2022/02/24 13:09
    • Last Updated:2022/02/24 15:58
  • (PPSQ) Replacing the mobile phase

    1. Replacing the mobile phase 1)Click [LC Control] on the [Maintenance] menu in the [PPSQ Analysis] window. 2) Set the pump flow rate to 0mL/min ... Show Detail

    • No:8402
    • Date of Issue:2022/02/24 14:01
    • Brached FAQ
  • (PPSQ) Replacing the Nitrogen Gas Cylinder

    Occasionally check the nitrogen gas cylinder's pressure regulator during system operationand, if the residual pressure is low, replace the cylinder as soon a... Show Detail

    • No:8405
    • Date of Issue:2022/02/24 14:24
  • (PPSQ) Disposing of Waste Liquid

    As sample analysis is repeated, the amount of liquid in the waste bottle increases. Occasionally check the amount of liquid in the waste bottle and dispose ... Show Detail

    • No:8407
    • Date of Issue:2022/02/24 14:32
  • (PPSQ) Replacing the column

    « Removing the column» 1. When the pump is running, push [pump] onthe pump. 2. Open the cover of the column oven. 3. Remove the tube connecting to the i... Show Detail

    • No:8409
    • Date of Issue:2022/02/24 14:54
    • Brached FAQ
  • (PPSQ) System Startup

    1. Turning ON Power 1) Turn ON the power to the detector and the column oven. 2) Turn ON the power to the PPSQ. 3) Turn ON the power to the PC and the ... Show Detail

    • No:8410
    • Date of Issue:2022/02/24 15:29
    • Brached FAQ
  • (PPSQ) Changing the Number of Analysis

    It's possible to change the number of analyses during the execution of sample analysis. 1. Click [Change Number of Cycles] on the registration frame of th... Show Detail

    • No:8415
    • Date of Issue:2022/02/25 09:06
  • (PPSQ) Disassembling/Assembling the Reactor

    1. Remove the inlet tube fixing screw. 2. Loosen the outlet tube fixing screw. NOTE: To Loosen a little is enough. Do not remove it. 3. Rem... Show Detail

    • No:8418
    • Date of Issue:2022/02/25 10:31
    • Brached FAQ

1-10 of Total 18

This site uses the FAQ system "PKSHA FAQ", which is a product of PKSHA Communication Inc.